Personal computer
UnlockedToday
A creative studio on your desk.
- GPUs
- 1
- CPU cores
- 16
- Memory
- 32 GB
- QPU qubits
- none
- Images
- Art
- Music
ComputeVision
The physical ladder: energy, water, chips. Computers level up, and bigger computers can give back.
A vision, where this goes. What runs today is your ComfyUI, on a RunPod pod: see the Compute Crafter.
Three computers
How each of the three could work, and how its power, uptime, carbon and water compare. A vision: no such computer is built yet.
Pick a computer. The charts below light up its bars. Hover a card to see how it works.
Each step right is ×100. Dashed bars are our estimates.
US utility scale, 2021 to 2025 (EIA). Star has no line: no fusion plant has run yet.
The 2025 uptime of each, as hours of a 24 hour day.
Medians from IPCC and NREL. Coal and gas are there for comparison. Star is an estimate, dashed, because no fusion plant exists. Its water is a range, 0 to 672: about 670 if wet-cooled like nuclear today (range 580 to 850); near zero if air-cooled, at about 7% less output. The data center's own cooling adds roughly 100. Sources: Macknick et al., NREL/TP-6A20-50900, Table 2 (opens in a new tab) (nuclear, tower: median 672, range 581 to 845; the 6.8% dry-cooling output penalty); LBNL-2001637, 2024 United States Data Center Energy Usage Report (opens in a new tab) (site WUE about 0.36 to 0.48 L/kWh).
Vision
Forty-nine imagined sites, from one Solar computer in Colorado to a world lit by all three. Our picks, not plans.
The globe loads when it comes into view.
Drag to turn it, click a site to fly there. With a mouse, Ctrl and the wheel zoom; the + and − buttons do it too. Figures are rough orders of magnitude from the ladder above.
Today
A creative studio on your desk.
×1,000,000a million times the power
Today
Today's cloud: halls of GPUs, wired as one.
SoulCraft runs here today, on RunPod.
×1,000a thousand times the power
2030sour guess
Sunlit data centers, on Earth or in orbit.
×10ten times the power
2040sour guess
Earth's heat in; power and water out.
×100a hundred times the power
Laterour guess
Fusion: unlimited energy for it and everything around.
Takes 0 to 670 gal/MWh, depending on cooling. Gives water back only if its waste heat runs desalination (vision).
Rough orders of magnitude. Levels 3 to 5 are our vision.
Today, it starts with a workflow
that runs on a personal computer and in data centers. Computers lift the intelligences:
Figures marked est. are our own estimates, not measurements. The values and the table each is read from are in src/data/compute-ladder.ts.